DIREKTKONTAKT
  Fon: (05031) 90 26 - 0
  Fax: (05031) 90 26 - 21
 

   


  Cable-Stayed Bridges

Neckarbrücke Zwingenberg

Cable-stayed bridge crossing the Neckar-river

Average span width 121,50 m

Handling period          2009 - today
Construction period    2009 - today
Our contribution        detail design

 

 

 

                                                                                                                                              

 

3 Cable-stayed bridges in the course of the BAB A30/
bypass Bad Oeynhausen

 


construction 4

Two composite cable-stayed bridges as motorway overbridge crossing the Werre river

 

Handling period          2006 - 2009
Construction period    2009 - 2012
Our contribution: due to § 55, Lph. 2, 3, 4(partly), 6
§ 64, Lph. 3, 6
§ 92, Lph. 1, 2,3  HOAI


construction  26

 

 

 

 

 

PDF zum Download


construction 29

                                                                                                                                              

 

Hochstraße Bremen

Composite cable-stayed bridge with steel pylon and composite columns
Locked coil strands with d = 127 mm or accordingly 152 mm
Main span 127 m; width 24 m

Handling period          2004 - 2007
Construction period    2005 - 2008
Our contribution:      due to § 55, Lph. 5
                             § 64, Lph, 4, 5 HOAI

PDF zum Download

                                                                                                                                               

Rheinbrücke Kehl-Straßburg
(Mimrambrücke)

Composite cable-stayed bridge as a pedestrian and bicycle path crossing the Rhine river
Span width 183 m
Complicated mounting


Handling period          2002 - 2004
Construction period    2003 - 2004
Our contribution: due to § 55, Lph. 4
                        § 64, Lph. 4 HOAI as well as installation engineering and consulting
                            

 

PDF zum Download

Link to Structurae

                                                                                                                                               

 
      © 2009 Meyer + Schubart