Fon: (05031) 90 26 - 0
  Fax: (05031) 90 26 - 21


  Special constructions

Baumwipfelpfad in Scheidegg


Adventure climbing path between tree tops consisting of suspension bridges  and steel structures with timber planking

2 Towers, 14 masts, 17 connecting paths
Total length of paths   ca. 550m
Height of path (above ground-level) around 25m
Highest mast              ca. 40m

Handling period          2010 - today
Construction period    2010 - today
Our contribution:       structural design




temporäre Arbeitsplattform

Link zu Google Maps

Temporary work platform, supporting structure as a truss structure with rolled sections (tubes and HEB-Profiles)

Size: approximately 8,50m x 16,00m
                 height 6,50m 

Handling period          2009-2010
Construction period    2010 - today
Our contribution: detail design



WM Stadion Durban


Football stadium for the World Cup 2010
Y-shaped bearer as steel box girder, span width 347m
Arch height/ king pin inclination angle: 92m / 61m


Handling period           2008-2009
Construction period     2009
Our contribution: detail design

PDF zum Download



Maksimir Stadion Zagreb


Football stadium and multi-purpose hall, moveable roof as tube truss
Main span between supporting columns 132m plus 2 x 50m cantilever

Handling period    2007
Our contribution: detail design


PDF zum Download



KÜ Lippe

Link zu Google Maps 

Overbridge of the DEK crossing the Lippe-river at Datteln
Steel hutch with complex inclusion
Spans (filled state): 24 - 24,4 -24m
Span (empty state): 72,4m

Calculations as 3D-FEM-system

Handling period         2004 - 2006
Construction period   2007 - 2009
Our contribution: due to §64, Lph.4 HOAI


PDF zum Download



Leitwerk für KÜ Lippe


Beam grillage with chain suspension
Span 4m to 8m

Involvement of kneadable joints 


Handling period         2004 - 2006
Construction period   2005 - 2008
Our contribution:      detail design


PDF zum Download



Ringträger für Raupenfahrwerk


Ring carrier: deformation restraint of a complex construction
Size: 7m x 5m
Difficult welding details



Handling period         2006
Our Contribution       FEM-calculations


PDF zum Download



Seilköpfe für Elbebrücke Niederwartha


Sockets: calculations as a 3D-FEM-system with volume elements
Optimization of measurements
Cable diameter: 99 - 122mm



Handling period        2008         
Our contribution       FEM-calculations


PDF zum Download