Nordumgehung Bad Oeynhausen

Construction 4:  Overbridge for the A 30 motorway crossing over the Werre
West river, composite cable-stayed bridge

Construction 26: Overbridge for the pedestrian and bicycle path, steel superstructure with tension rods

Construction 29: Overbridge for the A 30 motorway crossing over the Werre Ost river 
composite cable-stayed bridge

PDF zum Download


Waldschlößchenbrücke Dresden

Link to Google Maps

Composite steel bridge crossing the Elbe-river with side spans on steel v-columns
Total span width 636 m
Main span (arch) 148 m

Handling period         2003 - 2008
Construction period   2008 - today

Our contribution: due to § 55, Lph. 3, 6
                             § 64, Lph. 3, 6 HOAI

PDF zum Download

Link to Structurae


Link to Google Maps

The Brooksbrücke has been constructed as a steel framework arch bridge with suspended carriageway. The bridge was erected in 1888.
Total width 17,30 m; span 44 m

The construction basically consists of a renewal of the carriageway and the pedestrian path with additional mounting of a temporary construction, renewal of corrosion protection for the entire steel construction, the exchange of particular, highly corroded components, the refurbishment of bearings, the refurbishment of abutments, including partial renewal of the chamber walls and a renewal of the cables attached to the bridge.


Truss arch bridge with arched plate - concrete carriageway construction
Handling period         2009 - today
Construction period   2010 - today
Our contribution: refurbishment planning



Composite arch bridge with suspended deck
Span width 86 m
Span temporary bridge 85 m

Handling period 2002 - 2009
(interim planning break)      
Our contribution: due to § 55, Lph. 2, 3, 4, 6 § 64, Lph. 3, 6 HOAI


Bornaische Brücke

Alternatives analysis for a new substitutional construction
Overbridge of a triple carriageway and a two-track metropolitan railway crossing railway tracks
1. Version: tight arch bridge with suspended composite deck
2. Version: steel deck bridge
Span 45m

Handling period         2009 - today
Our contribution       outline planning, recalculations